EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (676)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
-
Wing Wiring
-
Landing Lights and...
-
Cockpit Light
-
Wing Tips
-
Nav/Strobe light...
-
Wingtip and Landing...
-
Wingtip and lights
-
Landing light
-
Wiring
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (3)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (50)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1988
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Jun 02, 2023
Wingtip and lights
- (3.5 hours)
Category: Lighting
Completed drilling for clecos on right tip. Both tips now ready to glue. Test fit Aero Led landing light in left wing. Installed Deutsch connector on supply wire cable. Trimmed both landing light lenses.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.